Returning a Submittal Item

UPDATING A SUBMITTAL – FROM ARCHITECT TO SUBCONTRACTOR

 

SubmittalToolbar

                                                 

 

In the submittal module, click on the package number you wish to update.
You have the ability to search for a particular package by inserting criteria into the search fields.

Submittal Summary for Return

 

ArchSubmittalReturn

 

This will bring both package and item information.
Action column will show what action is required on the submittal. Action Icons for Submittals

 

 

Processing Icons
Submit Icon (to architect)

 

Return Icon (to subcontractor)

 

       Re-submit Icon (to architect)  

 

To update all items
Click on the selection box at the top of the first column
Click on the Return Icon in the tool bar at the top of the screen
If you are updating an individual item in the submittal package
Click on the selection box of that specific item
Click on the Return Icon in the action column

 

TransmittalSummaryScreen

 

SubmittalItemForReturn

 

This brings up the Returned Submittal Items screen
Item – lists the item number
Revision – lists the revision number

 

Note: As you revise the information in the following columns, click on the Copy Down button to copy all information in that column Copy Down Submittal Item Return

 

Submittal Return Dialog

 

Copies – revise the number of copies to show what will be sent back to the subcontractor (this will be shown on the transmittal)
Date Received – insert date received back from the Architect
Date Returned – date the submittal is returned to the Subcontractor; defaults to current date but can be modified
Status – select status for each item
Click Save & Transmit Package

This will take you into the transmittal processing for the submittal.  Proceed as described above.